Testing laboratory

  • Home
  • Testing laboratory

Testing laboratory

In line with Egypt’s national vision to enhance the efficiency of local products and to support local manufacturers of fire pumps, and out of our confidence in the national product, **Hemaia** has established testing laboratories to ensure the efficiency and safety of the most critical components of the fire protection network. These laboratories include the following:

Fire Pump Testing Laboratory

Fire Network Pipe Testing Laboratory

Firefighting Foam Production Laboratory

Fire Pump Testing Laboratory.

Fire pumps are considered the most critical component of the firefighting system. Therefore, ensuring their safety and verifying their efficiency is a top priority for all professionals working in the field of fire protection.

  • The fire pump set consists of three pumps: (Electric – Diesel – and Jockey.)

 

  • A complete and thorough inspection is carried out on all components of the pumps (Electric and Diesel).

 

  • Testing is conducted in accordance with the Egyptian Civil Defense regulations and the NFPA 20 Fire Code standards.
WhatsApp Image 2024 11 21 at 15.44.39_3455bfd8
01

Schedule the test

The client contacts us to set an appointment for our technical team’s visit to inspect the water pumps at the site.

02

Conducting the technical test

Carrying out visual and operational inspection tests for the fire pumps

03

Delivering the results report

After completing the test, we provide the client with a detailed technical report that includes the pump condition and the necessary recommendations.

ShapePipe test

Fire pipe testing laboratory:

Fire pipes are among the most important elements of the firefighting network, and their integrity means the safety of the entire system.

ShapeFoam test

Foam production laboratory used for firefighting purposes:

The foam production laboratory is the first of its kind in Egypt and targets all sectors working in the petroleum and oil field to ensure the safety of the system and its workers.

FOAM AFFF (1)
ShapeImplementation mechanism

Simple steps to be safe

01

The complete documents related to the pumps are inspected.

02

Setting the station unloading date and the test date.

03

Scheduling the station unloading date and the test date.

04

Issuing the official pump validity certificate document